Mooring repositioning
Explore how coordinated changes in three mooring lengths move a Spar toward a requested position.
How can line lengths reposition a platform?
What you can model
A feedforward plan selects three line lengths for a target surge position. The plan-view diagram connects the line arrangement to the platform location and applied load. After an initial hold, rate-limited commands shorten one line and lengthen the other two, allowing the platform to move under the resulting mooring forces.
What you can explore
Follow the length commands, then compare target and actual surge through the repositioning maneuver. The position-error trace shows how the moving system approaches the planned endpoint. Together, these plots connect coordinated line changes to the motion achieved by the platform.
More from PlatformDynamics
FPSO with dynamic moorings
Follow vessel motion and mooring tension together as a floating system responds to a short surge pulse.
Explore example →Ballast and platform tilt
Connect ballast redistribution to changes in platform roll and pitch, from planned tank fills to the resulting motion.
Explore example →